A complex four-level directional interchange designed to handle over 200,000 vehicles daily at the junction of two major interstate highways. The project features 14 bridge structures, advanced stormwater management systems, and noise-reduction barriers. Our traffic modeling team used microsimulation to optimize ramp geometry, achieving a 45% reduction in congestion-related delays compared to the previous cloverleaf design.

Leave a Reply

Your email address will not be published. Required fields are marked *